Thursday, April 29, 2010

Existing Manhole At New Master Bedroom Diversion Works

The existing manhole inside the new master bedroom to be removed and install 6" dia. pvc pipe running through under the beams and to be joint with new bathroom..
The Sifu himself fixing the new routing sewerage pipe..

No comments:

Post a Comment