Kitchen area completed brickworks and demolished the existing walls. Roof Covering and bricklaying works completed. Still looking for the design of edge of trusses. Electrical works running through ceilings at patio. Completed store room.
The existing manhole inside the new master bedroom to be removed and install 6" dia. pvc pipe running through under the beams and to be joint with new bathroom.. The Sifu himself fixing the new routing sewerage pipe..
Roof covering near completion. Kitchen bricklaying works completed. Bathroom in master bedroom. Electrical wiring works in progress as not to hinder wall plastering works. Groundslab casting works in progress.
Additional roof beam for store room area completed. The edge of roof will be joining from front to the store as this will become wrapped around terrace.. Master bedroom bricklaying works completed. To install lintel beam for door opening to the bathroom. Door frame and bricklaying works to the kitchen door entrance..