Friday, April 30, 2010

Progress Report

Kitchen area completed brickworks and demolished the existing walls.
Roof Covering and bricklaying works completed. Still looking for the design of edge of trusses.
Electrical works running through ceilings at patio.
Completed store room.

Thursday, April 29, 2010

Existing Manhole At New Master Bedroom Diversion Works

The existing manhole inside the new master bedroom to be removed and install 6" dia. pvc pipe running through under the beams and to be joint with new bathroom..
The Sifu himself fixing the new routing sewerage pipe..

Wednesday, April 28, 2010

Store Room Construction


Bricklaying works to the store room in progress.

Tuesday, April 27, 2010

Brickwork In Progress1

Roof covering near completion.
Kitchen bricklaying works completed.
Bathroom in master bedroom.
Electrical wiring works in progress as not to hinder wall plastering works.
Groundslab casting works in progress.

Monday, April 26, 2010

Anti Termite


Spraying of anti termite before casting ground slab.

Sunday, April 25, 2010

Main Entrance Door Frame Installation


Additional roof beam for store room area completed. The edge of roof will be joining from front to the store as this will become wrapped around terrace..

Master bedroom bricklaying works completed. To install lintel beam for door opening to the bathroom.
Door frame and bricklaying works to the kitchen door entrance..


Friday, April 23, 2010

Demolition Works

First demoltion work carried out to Bedroom 3 for the adjustment of new window.
Bricklaying works for the new bathroom still in progress.


Bricklaying works for the new Master bedroom.

Wednesday, April 21, 2010

Additional Work For New Store

Excavation for footing and groundbeams for new store (additional works)
Completed roof covering at new patio.
Completed brickwork.

Plumbing And Wastewater System


Bathroom Plumbing And Sanitary Works

Manual excavation works for underground wastewater pipe installation works to divert existing sewerage manhole.


Kitchen area excavation works for wastewater and plumbing system installation.

Tuesday, April 20, 2010

Proposed Concrete Imprint And Drainage

This are the sample for concrete imprint and drainage to be construct for new patio.

Monday, April 19, 2010

Halal Brush For Painting Works

Now you can get Halal Brush for painting your house.

Sunday, April 18, 2010

Brickwork In Progress

Wall and window opening at new living room.
Bricklaying works in action..
Brickwork at new master bathroom..
Brickwork at new master bedroom.

Thursday, April 15, 2010

Roof Covering For Patio

Roof covering for new wrapped around patio in progress....




Close up shot of timber trusses installation.