Showing posts with label bathroom. Show all posts
Showing posts with label bathroom. Show all posts

Monday, June 21, 2010

Shower Screen


Shower screen completed installation works...

Sunday, June 20, 2010

Bath Tub

Completed installation of bath tub and now ready for the tile finishing works.

Wednesday, June 16, 2010

Saturday, June 12, 2010

Bathroom Wall And Floor Tiles

Completed wall tiles for new bathroom.

Saturday, May 15, 2010

Bathroom Sample Finishing

This is sample of the bathroom to be contruct and for reference only as the proposed bathroom has the same floor layout. Lebih kurang laa..
The floor, the wall tiling have 2 color tones and with glass mosaic tiles for bordering. Take note the recess wall for the shampoo and soap compartment. The ribbon is for display only..
The concept more or less will be completed as per pictures above....kalau boleh..

Hot and Cold Plumbing System Testing

Testing the pressure of the shower system.
Hot and cold water shower system
The system layout.

Hot and cold mixer point.

Thursday, May 13, 2010

Hot and Cold Plumbing System

The location for hot water storage compartment...to use Joven 50 liter series...
DIY for hot and cold water system.
Buat sendiri.....Man buat...

Bathroom Fittings

Bath tub for new master bedroom..
Aluminium sliding & folding for new bathroom..
Already acquired wash basin to be install on top of concrete counter.

Wednesday, April 21, 2010

Plumbing And Wastewater System


Bathroom Plumbing And Sanitary Works

Manual excavation works for underground wastewater pipe installation works to divert existing sewerage manhole.


Kitchen area excavation works for wastewater and plumbing system installation.