Showing posts with label sanitary. Show all posts
Showing posts with label sanitary. Show all posts

Saturday, May 1, 2010

External New Manhole


Encountered rock during manual excavation for waste water system.

Thursday, April 29, 2010

Existing Manhole At New Master Bedroom Diversion Works

The existing manhole inside the new master bedroom to be removed and install 6" dia. pvc pipe running through under the beams and to be joint with new bathroom..
The Sifu himself fixing the new routing sewerage pipe..

Wednesday, April 21, 2010

Plumbing And Wastewater System


Bathroom Plumbing And Sanitary Works

Manual excavation works for underground wastewater pipe installation works to divert existing sewerage manhole.


Kitchen area excavation works for wastewater and plumbing system installation.