Saturday, June 26, 2010

Wednesday, June 23, 2010

Painting Works To Master Bedroom


Completed painting works to the wall and ceiling...

Tuesday, June 22, 2010

Brickwall Fence And Bali Style Entrance

Brickwall laying works including Bali style entrance

Patio Floor Tiles


New patio floor tiles near completion...to install tiles skirting at walls.

Monday, June 21, 2010

Shower Screen


Shower screen completed installation works...

Sunday, June 20, 2010

Bath Tub

Completed installation of bath tub and now ready for the tile finishing works.

Thursday, June 17, 2010

Patio Tiling Works

Plastering works to new patio flooring to receive new 300x300 tiles.

Wednesday, June 16, 2010

Saturday, June 12, 2010

Timber Ceiling

Completed timber ceiling at patio and waiting for the paint works. Colour to decide.

External Fences

Rear brickwall fence completed works.

Completed column for fencing work.
Formwork and rebar fixing works to fences structure.

Completed Floor Tiling Works

Completed works of floor tiles.
Cleaning the surface of tiles before grouting with cement colour.
Grouting with cement colour in between joints.

Bathroom Wall And Floor Tiles

Completed wall tiles for new bathroom.

Friday, June 11, 2010

Building Apron And Drainage Mock up

The new drainage will be covered by small rounded rocks on top of pvc drain cover..

Thursday, June 10, 2010

Skim Coat

Applying skim coating to the existing wall at master bedroom.

Floor Tiling Works

Mixing the special cement additives for tiling works at living room.
Setting out and lay 600mmx600mm homogeneous tiles.

Completed glass mosaic for kitchen wall tiles.

Sunday, June 6, 2010

Clubbing?

Attended rock concert by Search Group at The Mines. Sudah tua laa pakcik mau goyang kepala..It's been a long time tak tengok rock concert. Rasa semacam aje bila tengok Haji Amy Search nyanyi. But nevertheless they are the real rockers.

Anyway kita layan video rock Search And Wings sebentar...



Friday, June 4, 2010

Exposed Roof Trusses And Roof Overhang

Edge of exposed roof trusses carving works...to get the traditional old Malay House look.

Wednesday, June 2, 2010

Wall Tiling Works

Kitchen wall tiles using Glass Mosaic in between ceramic tiles at kitchen area. The glass mosaic position is between lower and upper kitchen cabinet..
The layout of ceramic tiles laid horizontally..not as usual.
The position of the power outlet should be in the centre of the ceramic tiles..to repair..